Trang chủ Procedures for installing new water meters for households

Procedures for installing new water meters for households

3 giọt nước 3 giọt nước 3 giọt nước

  1. CONDITIONS FOR INSTALLING WATER METER WATCHES

  • Households have legal housing but have not installed water meters.
  • The registered location is within the water supply area of Ba Ria – Vung Tau Water Supply Joint Stock Company.
  • The place of registration for installation is not in the area that has been notified of withdrawal of land clearance by the local authority.
2. APPLICATION REGISTRATION DOCUMENTS (1 SET)
  • Application form for installing a water meter using the form below (a sample request for installation of a water meter)
3. WATER METER INSTALLATION PROCESS
Work description Work location Implementer Note
Submit application for water meter installation Customer transaction office Customer 01 set
Clock cluster design survey At the registered installation location
  • Technical staff
  • Customer
According to appointment paper
Sign a water use contract Customer transaction office Customer  
Water clock installation construction, handing over works At the registered installation location
  • Installation worker
  • Customer
 

4. INSTALLATION COST


Please download the attached file to get an application form, fill in the required information and submit it at the company’s transaction office during office hours.

ATTACHED FILESWater meter installation request form